A realistic project timeline, the five questions to answer before starting, and a prevention checklist pulled from all five failure patterns in this article.
Naive vs realistic time estimates for each project stage, and why the gap exists.
ReferenceThe questions every CV project should be able to answer clearly before work begins.
ChecklistWhat prevents each of the five failure patterns, consolidated from the article.
ChecklistSelected resources are designed to support experimentation and practical understanding through focused implementations, utilities, and companion materials accompanying each article. This article's supporting code is limited to figure generation, so its resources here are drawn directly from the article's own analysis rather than a code snippet.